Seven-a-Side and Eleven-a-Side state of the art 3G football pitches and boasting a full-sized 3G hockey pitch.
Changing facilities, canteen, bar and four multi-use class rooms; all areas finished to the very highest standards. Again, all lighting, emergency lighting, addressable fire alarm, data and comms, CCTV and audio visual systems designed, installed and commissioned by PEI-Delta’s in-house team.
![Training-Centre(9)](https://pei-delta.co.uk/wp-content/uploads/2019/04/Training-Centre9.jpg)
![Training-Centre(1)](https://pei-delta.co.uk/wp-content/uploads/2019/04/Training-Centre1.jpg)
![Training-Centre(5)](https://pei-delta.co.uk/wp-content/uploads/2019/04/Training-Centre5.jpg)
![Training-Centre(6)](https://pei-delta.co.uk/wp-content/uploads/2019/04/Training-Centre6.jpg)
![Training-Centre(4)](https://pei-delta.co.uk/wp-content/uploads/2019/04/Training-Centre4.jpg)
![Training-Centre(8)](https://pei-delta.co.uk/wp-content/uploads/2019/04/Training-Centre8.jpg)
![Training-Centre(2)](https://pei-delta.co.uk/wp-content/uploads/2019/04/Training-Centre2.jpg)